Empower Your Business Advanced Solar Solutions Nationwide with Athol Energy.
Customized Solutions for Large-Scale Projects
Tailored solar designs to meet the specific needs of commercial and utility-scale projects, ensuring maximum efficiency and performance.
Expertise in Regulatory Compliance
In-depth knowledge of local, state, and national regulations to streamline the approval process and avoid delays.
Comprehensive Financial Analysis
Transparent cost assessments and savings projections to help you make informed decisions and optimize your investment.
Reliable and Efficient Planning
Our solutions are designed to integrate seamlessly with your project requirements, ensuring reliability and efficiency in design and regulatory compliance.
Hours
Minutes
Seconds
Commercial Solar Consulting Services
At Athol Energy, we offer a wide range of consulting services designed to support every aspect of your commercial solar project. Our extensive track record spans small commercial setups to large utility-scale operations nationwide. Here’s how we can help:
Complete Commercial Solar Design Packages:
Our permit-ready commercial solar and energy storage design packages are customized to the requirements of your local authority having jurisdiction (AHJ) and utility. Each plan set typically includes:
- Project Description
- Construction Notes
- Governing Codes
- Site Plan
- PV Layout
- Mounting & Racking Methods
- Electrical Details
- Three-Line Electrical Diagram
- Electrical Calculations
- Parts List and Required Safety Placards
- Data Sheets for Modules, Inverters, Racking, Mounting
- Elevation views as needed for certain jurisdictions
- Other requirements as specified by your AHJ
Complete Scope of Commercial Solar Design Services
Athol Energy offers a comprehensive scope of design and engineering services for all commercial, industrial, agricultural, municipal, university, school, and hospital projects. Athol Energy’s commercial solar engineers design systems for:
- Permitting and Interconnection
- Solar Carports and Canopies
- EV Charging Stations for Parking Lots
- Single Axis-Tracker System Design
- Ballasted and Unballasted Rooftops
- Aggregated Meters for Warehouses and Compounds
- Agriculture and Cold Storage
- Building Integrated Photovoltaic (BIPV)
- Floating Photovoltaic Systems (Floatovoltaics)
- New Construction
Permitting and Procurement
Athol Energy offers a comprehensive solution for your solar power project, covering every aspect from planning to activation. With extensive experience in key markets across the country, we ensure your project is handled with the utmost expertise.
1. Consultation and Design
We begin with a detailed consultation to understand your energy needs, goals, and budget. This is followed by a customized solar design created by our expert engineers, including schematic line drawings, layout drawings, and voltage calculations.
2. Customized Design
Athol Energy handles all necessary permitting and regulatory approvals, ensuring compliance with local, state, and federal guidelines. We ensure that all documentation is prepared accurately and submitted on time.
3. Coordination and Quality Assurance
Athol Energy coordinates closely with your chosen installation team to ensure the design is implemented accurately. We provide ongoing support and quality assurance checks throughout the installation process to ensure optimal system operation.
4. Activation and Support
Experience a seamless transition to solar energy with Athol Energy’s comprehensive approach. Contact us today to learn more about our turnkey solutions and how we can help you achieve your energy goals.
Hours
Minutes
Seconds
Transform Your Business with Solar Energy?
Unlock the potential of your commercial energy strategy with clear, affordable solutions.
Contact Athol Energy today to begin your seamless transition to solar power. Let our expertise, tailored solutions, and comprehensive support drive your business towards a sustainable and cost-effective energy future.